Industry: Food, Beverage, and Agriculture

Corval provided Design-Build services for Buddy’s Kitchen, growing their facility by adding 42,000 SF of freezer space and new pallet positions for their future cold storage needs. The project’s scopes of work included constructing a building envelope and new dock space, installing an underfloor frost-prevention system for the new...
St. Paul, MN – Corval Group has begun construction on a design/build project for Buddy’s Kitchen in Lakeville MN, that will facilitate their future growth with 42,000 additional square footage of freezer space. Designed in cooperation with Corval’s engineering team and VAA engineering, planning, and design services, the project...
Corval served as the General Contractor for PURIS Proteins LLC’s production facility in Dawson, MN. We have worked closely with PURIS since January 2019, providing engineering, constructibility, and cost guidance as it relates to material handling, production/process flow, refrigeration/utility upgrades, selective demolition, and overall construction execution of 57,000 linear...
Design-Build contract for expanded process piping system installation at Cargill’s Big lake facility. Cargill renovated two different process rooms with separate manufacturing equipment, Corval sized and installed the process piping for both rooms. Included the following systems: high pressure steam, hot water, cold water, cleaning foam, sanitizer, and compressed...
Installation of equipment skids, piping racks, and connection piping for new chilled water and chilled glycol system. Setting of three manufactured ammonia chiller skids along with pre-fabricated chiller building pump skids and piping racks. Chiller skids weighed upwards of 60,000# and single header rack weighed 80,000#. Setting and weld...