Cargill – Kitchen Solutions

Share Project:
Share on linkedin
Share on email
Share on twitter

Design-Build contract for expanded process piping system installation at Cargill’s Big lake facility. Cargill renovated two different process rooms with separate manufacturing equipment, Corval sized and installed the process piping for both rooms. Included the following systems: high pressure steam, hot water, cold water, cleaning foam, sanitizer, and compressed air. Included the installation of Coargill provided high pressure steam boiler and associated equipment (DA tank, water softener/treatment skid). Installation of new Cargill proided air compressors and air dryer with holding tanks. Design and installation of high/low pressure steam header, specially designed to meet Kosher facility requirement that boiler must maintain minimum temperature at all times while providing the ability to run at low pressure off-hours to minimize boiler operator hours.

Industry

Food, Beverage, and Agriculture

Project Duration

8 Months

Location

Big Lake, MN

Want to know more? Contact us.

Similar Projects

PURIS Proteins, LLC – New Production Facility

Corval Group served as the general contractor for PURIS Proteins LLC’s…

DOLD – Pre-cooked Bacon Capacity Expansion

Corval was the refrigeration contractor responsible for installation of a complete…

Nestle – Natural Refrigerant Conversion Skid

Nestlé’s Natural Refrigerant Conversion project included engineering, fabrication and installation of…