Corval was the Design-Build Contractor for HaF Equipment and installed new process equipment at Jabil’s Innovation Center in Chaska, MN. Corval’s engineers, millwrights and constructors worked with HaF to provide engineering and design, as well as fabrication and selective procurement for equipment platforms and the installation of specialized manufacturing...
Corval was the Design-Build contractor for the expansion of Glacial Lakes Energy’s ethanol production facility. The expansion was executed on a “fast-track” schedule and increased the facility production from 40 mpy to over 100 mpy. We also placed 2,500 cubic yards of structural concrete during the expansion. Corval worked...