Colorado Energy – Hardin Generating Station

Share Project:
Share on linkedin
Share on email
Share on twitter

Corval Group was the General Contractor for the construction of a 119 MW coal-fired power plant. The boiler and structural steel were salvaged form an existing plant in South Africa. The steam turbine generator was salvaged from a plant in South Korea. Corval refurbished equipment and materials for use in the new plant and added a modern air quality control system.
When constructed the Hardin Generating Plant was the cleanest coal burning plant in Montana and the first pulverized coal plant built in Montana in over 20 years. The project recognized by Governor of Montana for more than 1,000,000 man-hours without a lost time accident

Industry

Energy and Power

Project Duration

12 Months

Location

Hardin, MT

Want to know more? Contact us.

Similar Projects

Northwestern Energy – David Gates Generating Station at Mill Creek

Corval Group was the EPC Contractor for the design, construction, and…

City of Duluth / Evergreen Energy – Hot Water System

Balance of Plant scope involved completing the piping system for the…

NRG – Vikings Chilled Water Distribution

Corval was awarded the interior and exterior construction packages to provide…