Corval was the prime mechanical contractor in charge of installing all equipment at Rahr Malting’s Malthouse #5. Installed equipment included Steep tanks, grain handling equipment, fans, ductwork, pumps and all piping. Rahr’s Shakopee production facility annually produces 460,000 MT of malt, making it the largest single site malt production facility in the world.

Industry

Food, Beverage, and Agriculture

Project Duration

16 Months

Location

Shakopee, MN