Corval Group was the prime mechanical contractor for the installation of 40,000 ft of pipe ranging in size from 1” to 60” including stainless steel, carbon, ductile iron and pvc.
Corval Group also installed all major equipment which included:
Coarse Screens
Fine Screens
Grit Washer
Screen Conveyors
Turbine Pumps
Centrifugal Pumps
1000 HP Air Blowers
Coarse & Fine bubble aeration
Chemical Tanks
HVAC Equipment
Foul Air Equipment (fans, carbon tanks and frp pipe)
Cake Hoppers
Gravity Belt Thickeners
Centrifuges
Polymer Skids
Sluice Gates
Equipment Grouting

Industry

Public and Institutional

Project Duration

2 Years

Location

North Las Vegas, NV

Want to know more? Contact us.

Similar Projects

Totino-Grace High School – Addition & Remodel

Corval Group was the general contractor, in collaboration with RSP Architects,…

Johnson Senior High School

Corval Group was general contractor for the addition and renovation to…

Hastings Middle School Improvements

Hastings Middle School Improvements project was completed over the summers and…